Files
stickman/docs/plans
ryan c6f3930dcb Implement Phase 19 updates and user/editor verification
- Updated architectural specifications for Phase 19 scenery, backgrounds, and surface finishes to reflect implementation status and user verification results.
- Revised UI/UX specifications for background ground and wall color, plain background, and starter scene composition to indicate successful implementation and verification.
- Enhanced scenery controller and sandbox stage scripts to improve eraser functionality and user interactions.
- Adjusted test cases to align with the latest changes in scenery and background implementations, ensuring all checks pass successfully.
- Added new buttons for wall area erasure in the scenery capture bar and updated layout handling for better user experience.
2026-10-22 17:02:39 -04:00
..

Active plans and design briefs

Keep accepted Designer handoff briefs and future implementation plans in this directory. Name phase briefs phase_<number>_<feature_slug>.md and title them Phase <number> — <Feature>.

Designer briefs capture the product goal, user experience, scope, success criteria, and questions for the spec-pipeline. They are planning inputs, not final architecture specifications; the architect writes those in ../specs/.

Move completed or superseded plan drafts to ../archive/plans/.