Files
stickman/docs/plans
ryan ddb298f631 Add visual harmonization tests for editor UI components and ground finish chooser
- Implemented `test_editor_visual_harmonization.gd` to validate the Stickman editor and prop editor UI layouts, ensuring proper functionality and visual consistency.
- Created `test_editor_visual_theme.gd` to verify the loading and application of visual themes in the editor, including semantic overrides and default values.
- Introduced `test_phase19_ground_finish_chooser.gd` to test the ground finish chooser's functionality, including layout responsiveness, selection behavior, and interaction with the stage.
- Added new scripts for ground finish preview and chooser UI components to enhance the editor's visual representation of ground finishes.
2026-10-23 15:20:12 -04:00
..

Active plans and design briefs

Keep accepted Designer handoff briefs and future implementation plans in this directory. Name phase briefs phase_<number>_<feature_slug>.md and title them Phase <number> — <Feature>.

Designer briefs capture the product goal, user experience, scope, success criteria, and questions for the spec-pipeline. They are planning inputs, not final architecture specifications; the architect writes those in ../specs/.

Move completed or superseded plan drafts to ../archive/plans/.